GTA Wiki

Help required: categories

Hi everyone, please help us by filling out this form!


We are determining how players best define and/or differentiate the terms "game modes", "missions" and "activities". This will be used to help us develop a clear and logical category tree to house articles related to this type of content.


Thank you in advance for help!

READ MORE

GTA Wiki
Advertisement
GTA Wiki
19,871
pages

The Alta Construction Site is an unspecified building site under construction by STD Contractors in Grand Theft Auto V, located in Alta, Los Santos.

Description

The construction site is located on the block bordered by Alta Street, Occupation Avenue and Power Street in Alta, Los Santos.

The site has two multi-level buildings being erected by crane.

As a construction site, the site is usually busy during daylight hours, with construction workers roaming the site and interacting with it. Large machinery can often be heard operating and typical construction sites such as drills, banging and shouting may be played as ambiance around the site. Numerous vehicles can be seen parked, driving in or driving out of the site during daylight. A Bison, "The Mighty Bush" Bison, Sadler, Burrito, Mixer (both generations) or Biff may be seen driving in or out of the Alta Construction Site onto Power Street, Alta between 05:00 am and 11:00 pm (marker)[1].

  • May also be parked in one of two spaces within the construction area on Power Street (marker)[2].
  • May also be seen parked next to the construction cabin between 07:00 am and 18:00 pm.[3]
  • May also be seen driving out onto Occupation Avenue between 11:00 am and 15:00 pm.[4]

Molly Schultz implies in her meeting request to the protagonists that Devin Weston has some involvement in the development.

Prominent Appearances in Missions

Grand Theft Auto V

Grand Theft Auto Online

Freemode Events

Gallery

References

  1. Ymap:
    WORLD_VEHICLE_CONSTRUCTION_SOLO: CARS_CONSTRUCTION: 05:00 - 11:00
    
    X:135.039 Y:-417.4039 Z:40.11452
  2. Ymap:
    WORLD_VEHICLE_EMPTY: CARS_CONSTRUCTION: 00:00 - 24:00
    
    X:121.2626 Y:-443.1058 Z:40.10854
  3. Ymap:
    WORLD_VEHICLE_EMPTY: CARS_CONSTRUCTION: 07:00 - 18:00
    
    X:146.3549 Y:-371.1594 Z:42.25698
  4. Ymap:
    WORLD_VEHICLE_CONSTRUCTION_SOLO: : 11:00 - 15:00
    
    X:149.9216 Y:-346.0748 Z:43.3217
Advertisement